Current Location: Homepage > Investment > Key Project > Briefing

I. Project Name

Changcheng Road Development Project of Huayin City

II. Project Implementation Agency

Huayin Urban Construction Bureau

III. Project Description

The project is located at the city center of Huayin, which is a non-developed belt. It starts at the Huancheng Road (E) in east and ends at Changjian River in west. According to the city planning, the main road (2831m) is from the east the west and the width of red line of the road is 50 meters. At present, the study feasibility report and project argumentation have been completed. According to the state policies, joint venture or cooperation is acceptable.

IV. Total Investment and Cooperation Form

Total investment of the project is 500 million Yuan. 480 million needs to be introduced. According to related state policies, joint venture or cooperation is acceptable.

V. Anticipation of Market and Analysis of Investment Return

After the completion, it can realize production value of 1.5 billion Yuan and tax contribution of 300 million Yuan. The investment recovery period is 5 years.

Contact Person: Lan Zhenhua and Wang Wei

Telephone: 0913-4611038   0913-4626785

Address: Huayin City Construction Bureau, Huayin City Investment Promotion Bureau

Postal Code: 714200


 

I. Project Name

Yongji Yellow River Highway Bridge Project in Dali County

II. Project Implementation Agency

Dali County Traffic Bureau 

III. Project Description

The planned project is the important part of the second largest bone highway frame of Shaanxi Province, connecting the G108, S202 and the planned Yanhuang Highway and the National Road 209, Dayun expressway in territory of Shaanxi. To west, the road runs across Dali County, Linwei District and Xi’an and reaches Xianyang and connects Xihuang Expressway. To east, it runs over the Yellow River and Yongji Road and connects Yanhuang Highway, National Road 209 and Yunfeng expressway. It is a important road running across Weinan area of Shaanxi and Yongji area of Shanxi Provicne. The total length of the bridge is 4010.16 meter and drawing road is 6562.84 m. According to Grade II Bridge standard, the highway bridge shall be 12 meter wide.

IV. Total Investment and Cooperation Form

Total investment of the project is 338.712 million Yuan. Cooperation form is confirmed. .

Contact Person: Wang Xiaoming and Yan Xiaoying

Telephone: 13992381128   0913-3256100   13572318953

Fax: 0913-3222152

Address: Huacheng Road, Chengguan Township, Dali County, Shaanxi Province

Postal Code: 715100


 

I. Project Name

Centralized Heat Supply Project of Yanchang County City Area

II. Project Implementation Agency

Key Project Office of Yanchang County

III. Project Description

The project is planned to reconstruct boiler room and heat supply pipeline of two existing heat supply residential zone, newly build two centralized heat supply stations. The installation capacity of heat supply boiler is 124.96 mw and the heat supply area is1.923 million m2 and paved heat supply pipeline in urban area is 32.8 km.

IV. Total Investment and Cooperation Form

Total investment of the project is 128.6 million Yuan. Cooperation form: cooperation, joint venture or sole investment.

V. Anticipation of Market and Analysis of Investment Return

If calculated by 4.79 Yuan/m2 · month, the heat supply area is 1.923 million m2 and a year needs 120 days for heat supply, it can realize sales income of 36.8447 million Yuan, annual cost is 27.78 million Yuan and total profit 8.5 million Yuan.

Contact Person: Liu Yanrong

Telephone: 0911-8614623  13325315066


 

I. Project Name

Technology Innovation of Centralized Heat Supply Project

II. Project Implementation Agency

Yanchuan County Urban Management Bureau

III. Project Description

Yanchuan County is focusing on technology innovation of centralized heat supply. It is planned to build 4 heat supply stations, 7 exchaning stations and 32 imported exchange units and the heat supply area is about 1.8 million m2.

IV. Total Investment and Cooperation Form

Total investment of the project is 72 million Yuan. Cooperation form: joint venture or cooperation.

V. Anticipation of Market and Analysis of Investment Return

If calculated by 4Yuan/m2 · month, a year needs 120 days for heat supply, it can realize sales income of 28 million Yuan and total profit 7 million Yuan.

Contact Person: Feng Xiangping

Telephone: 0911-8112911   13309116618


 

I. Project Name

Centralized Heat Supply Project of Binxian County City Area

II. Project Implementation Agency

Binxian County Investment Promotion Bureau

Binxian County Urban and Rural Construction and Planning Bureau

III. Project Description

The project is planned to build Binxian County Urban Centralized Heat Supply Project to supply heat the urban area. The existing small boiler rooms for heat supply are banned. In near future, the heat supply area is 1.7 million m2 and heat load is 98MW; The length of pipeline is 3 km. In far future (2010-2012), the heat supply area is 3.6 million С, the heat load is 200MW and length of pipeline is 2.8 km. The heat supply pipeline belongs to double pipes heating system which is paved along the road network of the city. According to “Heat Supply Engineering Plan of Binxian County Seat Area”, it needs 20 heat exchangers. The construction period is 2 years. 

IV. Total Investment and Cooperation Form

Total investment of the project is 54 million Yuan. Cooperation form: cooperative construction.

 

Contact Person: Wan Wenyu

Telephone: 029-34929777

Fax: 029-34929777


 

I. Project Name

Centralized Heat Supply Project of Fengxiang County City Area

II. Project Implementation Agency

Fengxiang County Construction Bureau

III. Project Description

The project is planned to build a centralized heat supply project and adopt heat boiler and second grade pipeline. The heating of industrial building adopts one-off vapor supply. The county seat has 30,000 families and 16000 families have the conditions for centralized heat supply.

IV. Total Investment and Cooperation Form

The total investment of the project is estimated to be 35 million Yuan and it may adopt the cooperation form of joint venture or sole investment.

V. Anticipation of Market and Analysis of Investment Return

After the completion of the centralized heat supply project, it has favorable social, environmental and economic benefit. The whole investment will be recovered within 6 years.

 

Contact Unit: Fengxiang County Construction Bureau

Contact Person: Liu Zongxiang

Telephone: 0917-7212523

 


 

I. Project Name

Centralized Heat Supply Project of Yichuan County City Area

II. Project Implementation Agency

Yichuan County Urban Construction Bureau

III. Project Description

It is planned to build a centralized heat supply station and the heat supply capacity is 500,000 m2 in near future, 1 million m2 in far future including urban heat supply pipeline and other attached facilities.

IV. Total Investment and Cooperation Form

Total investment of the project is 29 million Yuan. Cooperation form: cooperation, joint venture or construction with sole investment by the investor

V. Anticipation of Market and Analysis of Investment Return

The annual heat supply area is 500,000 m2. If the profit is 6Yuan/m2, then the annual profit is 3 million Yuan, the heat supply capacity in far future is 1 million m2 and annual profit is 6 million Yuan.

 

Contact Person: Yuan Yudong

Telephone: 0911-4622973  13700217977


 

I. Project Name

Water Supply Project of Luyang Lake Development Zone, Weinan City

II. Project Implementation Agency

Investment Promotion Bureau under Luyang Lake Administrative Committee

III. Project Description

The project is planned to build a water supply project with the capacity of 50,000 m/d in Luyang Lake Development Area. In near future, the Yuajiapo Water Supply Project is 30,000 m3/d, the Qiaoling Water Supply Project is 10,000 m3/d and Water supply project of county seat wastewater treatment plant is 10,000 m3/d. the water has reached industry water standard and also can reach common water use standard. It is planned to build related facilities such as water supply pipeline and pressure equipment.

IV. Total Investment and Cooperation Form

Total investment of the project is 169 million Yuan. of which 98 million Yuan is for Yuanjiapo water supply, 15 million is for Qiaoling Water Supply and 46 million Yuan is for deep disposal of water supply, 10 million Yuan is for pipeline. Cooperation form: sole investment or cooperation.

V. Anticipation of Market and Analysis of Investment Return

The existing industry water price is 1.55 Yuan/m3. The water supply return shall be allocated according to the ratio.

 

Contact Person: Lei Qiang and Zhang Lei

Telephone: 0913-2109068   13892399669   13571331910

Fax: 0913-2109669

Address: Floor 4, Building 1#, Weinan Municipal People’s Government, Dongfeng Street

Post Code: 714000

E-mail: zhaoshangly@163.com


 

I. Project Name

Jingyang County Seat Water Supply and Mineral Water Development

II. Project Implementation Agency

Jingyang County Water Supply Bureau

III. Project Description

Zhangjia Mountain is located at northwest 30km away from Jingyang County, with nearly one hundred natural fountains and daily water of 8 tons. “Qiongzhudong” Fountain was discovered in Qin Dynasty. Emperor Tang Taizong drank the water and ever built Tongshou Palace“in Jingyang and regarded it as royal drinking and bathing water. The water quality is appraised by Xi’an No.4 Military Hospital and Xi’an Water Quality Appraisal Center of Ministry of Geology of P.R. China as well as Ministry of Geology and Mineral Resources of P.R. China, Ministry of Health of P.R. China and Ministry of Light Industry on 53 items analysis, the pathology indices are lower than the limit value. It is a kind of natural sterile mineral water containing calcium, magnesium,    iron, strontium and other microelement etc, which meets the state regulation of “Natural Mineral Water Drinking Standard”. The project is planned to pave a 35 km water transmission pipe and to draw the Zhangjia mountain water to Jingyang County Seat and build the Jingyang County No. 3 Plant and a mineral water processing plant.

IV. Total Investment and Cooperation Form

Total investment of the project is 150 million Yuan. Cooperation form: cooperation or sole investment.

 

 

Contact Person: Shi Jinrong

Telephone: 029-36222139

Fax: 029-36222139

Address: Jingyang County, Shaanxi Province

Post Code: 713700

 


 

I. Project Name

Water Supply Project of Dali County Sci-tech Industry Park

II. Project Implementation Agency

Administrative Committee of Dali County Sci-tech Industry Park

III. Project Description

According to the general plan of Dali County Sci-tech Industry Park, the water supply source land is the Weinan Sand Area. The project is planned to build water plant with daily water supply of 20,000tons. It has a water source station and a booster pump station and the total length of transmission pipeline is over 100,000. The building area of the water plant is 2000 m2. It can be separated into office area and standard workshop area. 

IV. Total Investment and Cooperation Form

Total investment of the project is 24 million Yuan. Cooperation form: cooperation, joint venture or sole investment.

V. Anticipation of Market and Analysis of Investment Return

According to water supply price made by the county price bureau, each ton of water is 2 Yuan. If the sales volume of water shall be 80% of the water supply, then the income from water can reach 17.52 million Yuan and annual water supply cost is 12.52 million Yuan, profit and tax is 5 million Yuan. The investment recovery period is 4.8 years.

 

Contact Person: Shi Jianfeng and Yan Xiaoying

Telephone: 0913-3661588  13892314806  13572318953

Fax: 0913-3661588

Address: Guanchi Township, Dali County, Shaanxi Province

Post Code: 715106

E-mail: hxqgwh588@sina.com

 


 

I. Project Name

Old City Reconstruction Project of Weinan City Center

II. Project Implementation Agency

Project Office of Weinan City Construction Bureau

III. Project Description

The projec, covering an area of 505 mu, is located at north of Renmin Street, south of Shengli Street, east of Jiefang road and west of Beitang lane. The construction content includes: land requisition, shed house dismantle, removal compensation, comprehensive reconstruction of road, power, natural gas, forestry and comprehensive reconstruction and urban supported facilities reconstruction. According to the state policies, the joint management shall be done. At present, the detailed reference planning is completed.

IV. Total Investment and Cooperation Form

Total investment of the project is 1.24 billion Yuan. According to the related state policies, the cooperative development is acceptable.

 

Contact Person: Chen Qi

Telephone: 0913-2078308

Fax: 0913-2055337

Address: Middle Section of Chaoyang Street, Weinan City

Post Code: 714000


 

I. Project Name

Xijie Old City Reconstruction Project of Shangzhou District, Shangluo City

II. Project Implementation Agency

Shangluo Urban and Rural Construction Bureau of Shaanxi Province

III. Project Description

Having a covered area of 123 mu and a construction area of 200,000 m2, the project connects Zhongxin street and Gonglong Road from west to east, north wall of Lianhu Park and Xibei Street from north to south. The project is planned to build a walking street integrating commercial trade, housing, entertainment and historical cultural tourism and it will be built by three stages according to the requirements of ancient-like building. According to the state industry policies, the cooperative development will be adopted. The construction period is three years.

IV. Total Investment and Cooperation Form

The estimated total investment is 400 million Yuan including relocation of residence of 100 million Yuan. According to the principal “Government Coordination and Enterprise Operation”, it invites tender in the public by investment promotion. Cooperation form: according to related state policies, it adopts cooperative development”. The investigation and controllable detailed plan has been done.

V. Anticipation of Market and Analysis of Investment Return

Xijie Old City Reconstruction Project of Shangzhou District is located in the central belt and it enjoys favorable position and huge development potential.

 

Contact Unit: Shangluo Urban and Rural Construction Bureau

Contact Person: Luo Tao and Yang Dangqun

Telephone: 0914-2313465

Fax: 0914-2312495

Address: South Section of Yidong Road, Shangluo City

Post Code: 726000


 

I. Project Name

Ancient Town Construction Project of Yuyang River Street, Yulin City

II. Project Implementation Agency

Urban and Rural Construction Bureau of Yulin City

III. Project Description

According to the planning of Yuyang River and river bank scenery, the project is planned to build traditional commercial-residence area and underground parking lot at Mopanwan area adjacent to south gate of Yulin city. The total covered area is 2.7 ha. The architecture style is blue title and white wall. It forms a shopping street area with special characteristics. The construction scale and content can be negotiated. According to the state policies, the joint venture or cooperative development is acceptable.

IV. Total Investment and Cooperation Form

Total investment of the project is 80 million Yuan. According to the related state policies, the development and construction may adopt the manner of joint venture or cooperation.

V. Anticipation of Market and Analysis of Investment Return

The project is adjacent to south gate of ancient Yulin City and the commercial and tourism atmosphere is outstanding. The ancient town focuses on special cultural tourism product and local special snack.

 

Contact Unit: Yulin City Investment Promotion Bureau

Contact Person: Wang Peng

Telephone: 0912-3599050

E-mail: davidwangp@sina.com


 

I. Project Name

Rainwater Pump Station Expanding Project of Linwei District, Weinan City

II. Project Implementation Agency

Linwei District Weibei Industry Park Administrative Committee, Weinan City. Linwei District Weibei Industrial Park is located at Xinshi Town, north Weihe river, is an important part of planned Weinan Center Center.

III. Project Description

Based on Xi’an, Weinan Central City and local industry development resources, Linwei District is the first selected place of east industries transferring to West area and the processing base of Xi’an High-tech Industries Development Zone and Xi’an Economic Technologies Development Zone. It aims at the three large industries of agricultural and sideline products deep processing, machinery and electronics and modern medicine. Based on the original drainage station, the project is planned to expand a rainwater pump which can receive the rainwater of the industry park in its surrounding 10 km2, solving the rainwater drainage problem of large quantity of low-lying areas. At present, the project proposal is completed and the feasibility report is being reviewed, the infrastructure facilities such have leveling and electric power is equipped and it has the expanding conditions.

IV. Total Investment and Cooperation Form

Total investment of the project is 22 million Yuan and it needs to be introduced. Cooperation form: cooperative development.

V. Anticipation of Market and Analysis of Investment Return

After the rainwater pump is completed, it can receive the rainwater from surrounding 10 km2, solving drainage problem of low-lying land and saving large quantity of earthwork project. It has deep significance on flood control.

 

Contact Person: Zhou Xinqian and Tian Zhongfeng

Telephone: 0913-8199814   0913-8199813  13892343335  13909130465

Fax: 0913-2112299

Address: Weibei New District, Weinan City

Postal Code: 714000


 

I. Project Name

Thermoelectrical Plant Construction Project of Huaxian Industry Park

II. Project Implementation Agency

Huaxian County Investment Promotion Bureau of Shaanxi Province

III. Project Description

Thermoelectrical plant has a covered area of 200mu and the planned capacity is two machines and three furnaces (2】50 MW +3】220t/h).The project is mainly to build power generation plant, industrial residue yard, water supply system, power ingress system, railway specialized line and auxiliary facilities, etc.

IV. Total Investment and Cooperation Form

Total investment of the project is 250 million Yuan and 30 million Yuan is planned to be introduced. Cooperation form: joint venture or cooperation.

V. Anticipation of Market and Analysis of Investment Return

Thermoelectrical Plant of Huaxian Industry Park is one of the important infrastructures. It will realize the comprehensive benefits like energy saving, environment improvement, heat supply quality improvement and power supply increase. The annual production value of 80 million Yuan, profit and tax of 12 million Yuan will be realized and the whole investment will be recovered within 5 years.

 

Contact Person: Liu Yubin and Wu Bin

Telephone: 0913-4725503   13571514339    13992366130

Fax: 0913-4715500

Address: No. 1, Huaxian County People’s Government

Postal Code: 714100

 


 

I. Project Name

Infrastructure Construction Project of Xingping Modern Equipment Manufacturing Industry Park

II. Project Implementation Agency

Administrative Committee of Xingping City Industrial Concentration Area

III. Project Description

Xingping Modern Equipment Manufacturing Industry Park covers an area of 27.5 km2. Covering an area of 2.43 km2 in the first stage, it is planned to build 7 roads, a transformer substation of 350000 kw and its power transmission grid; a concentrating heat supply system with 250 mw and 45000 tons pipeline system and its auxiliary water discharge facilities, a garbage forwarding station of 3.5 mu and other related facilities.  

IV. Total Investment and Cooperation Form

Total investment of the project is 500 million Yuan. According to the related state policies, the cooperative construction is acceptable.

Contact Person: Tian Yong

Telephone: 029-38619000

  【Big  Medium-sized  Small】  【Print】  【Close
Pen Name:
Anonymity
    viewers

All articles marked with "Article type: Original" posted on the website of the Ministry of Commerce and its sub-sites are copyrighted by this Website and its sub-sites. Any reproduction or use by any other websites, media or individuals must be attached with a clear indication of "Source: Ministry of Commerce Website".